Ardagh Group
Menu

Ardagh Group Implements The Glass Industry’s First Sustainable Battery Storage System

Ardagh Group has implemented a sustainable battery storage system to increase resilience and energy security at its glass container plant in Irvine, Scotland. It’s the biggest behind-the-meter storage system in Europe and the first ever system to be used in the glass industry.

The Irvine plant needs a reliable energy supply to support its continuous manufacture of glass containers throughout the year. The sustainable battery, provided by ESB Smart Energy Services, provides the plant with a reliable back-up during peak energy consumption and sends energy back to the grid when demand is low.

The solution is a combination of a Tesla battery and a grid-optimising platform:

The Tesla battery is designed to efficiently store energy during periods of lower demand and to support demand during intermittent power failures.

The grid-optimising platform enables Ardagh Group to participate in the National Grid’s Firm Frequency Response service. In practice, the battery reduces the plant’s reliance on the grid and when excess energy stored by the battery is not required, it can be delivered back to the National Grid.

Annelene Fisser, Group CSR & Sustainability Manager, Ardagh Group, says:

“We are committed to environmental responsibility and sustainable manufacturing processes and had been exploring battery storage solutions for a long time to help us effectively meet these commitments.

“When ESB approached us with its battery storage offering, we felt confident that this would provide the efficient and cost effective solution we were looking for.”

The solution means that Ardagh Group’s Irvine plant benefits from a secure, resilient and reliable supply of green energy, helping to support the Group’s sustainability agenda.

Ardagh Achieves ISO Certification

Ardagh Group Glass Facility Achieves ISO 14001:2015 Certification

Indianapolis (July 19, 2018) – Ardagh Group, Glass – North America, a division of Ardagh Group, today announced that its Dolton, Ill., facility achieved ISO 14001:2015 certification.ISO ...

18 Jul 2018

Redemption of $440m Notes due 2021

Redemption of $440 million 6.000% Senior Notes Due 2021

Ardagh Group S.A. (“Ardagh”) has today called for redemption in full of its $440 million 6.000% Senior Notes due 2021. The redemption date will be July 31, 2018.Following this redemption...

9 Jul 2018

Ardagh to Release Q2 2018 Results

Ardagh to Release Q2 2018 Results

Ardagh Group S.A. will publish its second quarter 2018 results on Thursday, July 26, 2018. A results release will be posted to our website at midday BST (07:00 ET) on July 26. Second quarter...

27 Jun 2018

Ardagh Produces Nivea’s New Deodorant Look

Ardagh Produces Nivea’s New Deodorant Look

Nivea, one of the world’s most popular deodorants, has a new look for its female range in a taller sleek shaped aluminium aerosol can designed by Beiersdorf and manufactured by Ardagh Grou...

25 Jun 2018